Huawei Scale 3 Smart Body Scale

Regular price £48.00 GBP
Regular price £53.00 GBP Sale price £48.00 GBP
Sale
Free Shipping via Australia Post
Color: Blue
Free Shipping Dispatched next day
Price Match Lowest prices guaranteed
Availability:
  • American Express
  • Apple Pay
  • Bizum
  • Google Pay
  • Mastercard
  • MB WAY
  • PayPal
  • Shop Pay
  • Union Pay
  • Visa
Regular price £48.00 GBP
Regular price £53.00 GBP Sale price £48.00 GBP

The Huawei Scale 3 Smart Body Scale helps turn everyday weigh-ins into a fuller view of your wellness progress, with HUAWEI TruFit™ body composition analysis, Wi-Fi and Bluetooth syncing, and clear reports in the Huawei Health app.

Key Features of Huawei Scale 3 Smart Body Scale

10+ Body Indicators

Track more than weight with body composition indicators designed to help you understand changes in body fat, skeletal muscle and overall progress over time.

HUAWEI TruFit™ Analysis

Huawei's body composition model supports detailed wellness reports in the Huawei Health app, giving you clearer context for fitness, weight management and daily health tracking.

Wi-Fi and Bluetooth Syncing

Connect by Wi-Fi or Bluetooth, then step on the scale and sync results to your phone. Wi-Fi support lets records upload without needing to open the app each time.

Family and Guest Support

The scale can recognise multiple users based on historical measurements and also supports guest measurements, so household members and visitors can record data more privately.

Clean Tempered Glass Design

A slim tempered-glass platform, discreet LED display, low scale feet and non-slip pads make the Scale 3 easy to place in a bathroom, bedroom or home gym setup.

App-Connected Progress Tracking

Use Huawei Health to review body composition reports and workout progress, helping you adjust your wellness goals with clearer data instead of relying on weight alone.

Product Specifications

Brand: Huawei

Model: Scale 3

Dimensions: 300 x 300 x 23.6 mm

Weight: about 1570 g excluding battery

Display: Discreet LED display

Materials: Tempered glass weighing surface, ITO film electrodes and ABS base

Battery: 4 x 1.5 V AAA batteries

Battery life: about 180 days based on three measurements per day

Connectivity: WLAN 802.11 b/g/n 2.4 GHz, Bluetooth 5.0 and BLE

System requirements: Android 5.0 or later, iOS 9.0 or later

Sensor: Resistance strain gauge pressure sensor

What's Included

1 x Scale

1 x Quick Start Guide

1 x Safety Information

1 x Warranty Card

Free AU-wide shipping is included.